Maintenance Work Value : RM 100,000.00 – RM 10,000,000.00
Maintenace Work Descriptions | Clients | Owner | Period | ||
---|---|---|---|---|---|
Linde Malaysia, Plant Pasir Gudang : -Desuperheating Piping Removal & Replacement Work -H2 Compressor C Multi Stage Cooler & Pipe Modification Work | Linde Malaysia S/B | Linde Malaysia S/B | Nov'2022 | ||
Guan Chong Cocoa Manufacturer Pasir Gudang - Pump Pipeline & Water Tank Nozzle Cleaning Work | Guan Chong Cocoa Manufacturer S/B | Guan Chong Cocoa Manufacturer S/B | Nov'2022 | ||
Heng Hiap Industries Plant At Tg.Langsat - Miscellaneous & Maintenance Works | Heng Hiap Industries S/B | Heng Hiap Industries S/B | Nov'2022 | ||
Galperti Manufacturing (Malaysia) S/B-Accessories Items Welding Works | Galperti Manufacturing (Malaysia) S/B | Galperti Manufacturing (Malaysia) S/B | Jan'2021 - Dec'2022 | ||
SDP Global Pasir Gudang Maintenance Work | Sri Takada Industries (M) Sdn Bhd | SDP Global Malaysia Sdn Bhd | Jan'2021 - Dec'2021 | ||
-LCTM TA2021 Defect Package (Reliability) - CUI2019, Cups, Dead Leg, Utilitiy Area -Spent Caustic Tank Interconnecting Piping Maintenance Work At NC1 Plant -Installation Work For New Cooling Tower Pump (P731C) At PP1 Area -Installation Work For 3D-331 Outlet Sample At FNC Area | Sri Takada Industries (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Jun'2021 - Dec'2021 | ||
LCTM Pasir Gudang : - Furnace 2H-112 Repair Work (New SLE & Zone 5) -Working Platform Fabrication & Installation Work At FNC Area. -Tank 3 Repair Work (2TK-5100E) -Replacement Work For 1 Unit 24" Manhole For D-225 2nd Hexane Accumulator -NC1 TA2021 Major Modification Work & Check Valve Crack Repair Work -Piping Modification Work For CWR Bypass Line (TV4001-46B) At PE1 Area - Switch Drain Valve Work At NC1 Area | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Jan'2021 - Dec'2021 | ||
LCTM Pasir Gudang - Terminal 3 Fire Water Line Modification Work & Repair Work For SAJ Old Line Vent Point. | Lotte Chemical Titan (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Oct'2020 - Nov'2020 | ||
Petronas Dagangan Bhd - Depot LPG Pasir Gudang Terminal - LPG Mounded Bullet Tanks(2 Units) Requalification Works. | Total Dynamic Engineering Sdn Bhd | Petronas Dagangan Bhd | Jun'2020 - Jul'2020 | ||
Kerry Plant At Bukit Raja , Selangor - Minor Shutdown Work & Others Plant Maintenance Works | Kerry Ingredients (M) Sdn Bhd | Kerry Ingredients (M) Sdn Bhd | Jun'2020 - Jul'2020 | ||
CSC Steel Plant Maintenance Work At Malacca Ayer Keroh-Mechanical Work For N2 PSA Relife Project (Phase 1 & Phase 2) | Linde Malaysia S/B | CSC Steel Sdn Bhd | Jun'2020 - Jun'2020 | ||
Shell Terminal Pasir Gudang - Tank 11 Tank Cleaning & Repair Work. | Total Dynamic Engineering Sdn Bhd | Shell Terminal ,PGI | May'2020 - Jun'2020 | ||
LCTM Pasir Gudang - 3" C4 Line Fabrication & Installation Work From FNC To NC 2 Plant. | Lotte Chemical Titan (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Jan'2020 - Jan'2020 | ||
Chevron (Caltex) Prai Terminal-Production Pump Replacement , Piping Fabrication & Installation Work. | Cericorn (M) Sdn Bhd | Chevron Malaysia Ltd | Dec'2019 - Apr'2020 | ||
Kerry Plant At Bukit Raja , Selangor - Piping Fabrication & Installation Work For Exdosd Box 2#3 & VOR Melting Tank Fabrication & Installation Work. | Kerry Ingredients (M) Sdn Bhd | Kerry Ingredients (M) Sdn Bhd | Nov'2019 - Jan'2020 | ||
Shell Terminal Pasir Gudang - Water Pushing & Dewatering Work , Hydrant FW Line , Gate Valve Replacement Work & Others Miscellaneous Maintenance Work. | Total Dynamic Engineering Sdn Bhd | Shell Terminal ,PGI | Aug'2019 - Dec'2019 | ||
Shell Terminal Pasir Gudang - Tank 6 Repair , Blasting & Painting Work | Total Dynamic Engineering Sdn Bhd | Shell Terminal ,PGI | Aug'19 | ||
LCTM Pasir Gudang : -CUI Repair Work At Cogen 2 Area -Defect Work At Reactor Loop - CUI Repair Work For Boiler H -PP1 Unplug Work -Y Strainer Repair Work For Furnace 2H-111. -Furnace H-114 Radiant Coil Replacement & Shutdown Work | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Jul'2019 - Dec'2019 | ||
LCTM Pasir Gudang: -New Compressor Installation Work & Scaffolding Work(2C-3500S)At NC2 Utility Plant. -Temporary Pipe Support Work At 3V-345 To 2T-410. -N2 Ring Installation Work At FNC Plant. -IA Line Fabrication & Installation Work For VOC Monitoring. -Air Knocker For CSS Pipeline Installation Work. -Reinforcement Pad Fabrication & Installation Work. -EPCC Of Hot Blowdown System Upsize At NC2 Area. | Sri Takada Industries (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Jun'2019 -Dec'2019 | ||
Shell Terminal , Pasir Gudang - Fuel Oil Intelligent Pigging Work & 12" Tie-In Work. | Total Dynamic Engineering Sdn Bhd | Shell Terminal ,PGI | Jul'2019 | ||
Baelocher (M) Sdn Bhd At Senawang Seremban - Plant Maintenance & Piping Works. | Huatar Engineering (M) Sdn Bhd | Baelocher (M) Sdn Bhd | Jun'2019 | ||
Rosek Toray Plant , Tanjung Langsat - Piping Fabrication & Installation Work For IBMH Packaging Area & IFW Line Modification Works. | Sri Takada Industries (M) Sdn Bhd | Rosek Toray Asean Malaysia | 2019 | ||
LCTM Pasir Gudang - Platform & Nozzle Installation Work At NC2 & WWT Area. | GIS Supply & Engineering Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2019 | ||
LCTM Pasir Gudang - Piping Work At PE1 Plant , Condensate 2V941 & CT711A/CT711B , Modification Work For Cooling Water Pipeline. | Sri Takada Industries (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2019 | ||
Sagami Batu Gajah , Perak - BG1 Solvent Piping Modification & Installation Work. | Sri Takada Industries (M) Sdn Bhd | Sagami Manufacturers Sdn Bhd | 2019 | ||
LCTM Pasir Gudang - Duct Burner Element Replacement Work At Cogen Area. | KSL PD Engineering Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2019 | ||
LCTM Pasir Gudang - Furnace 2H-111 , 2H-112 & 2H-113 Shutdown Work. | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2019 | ||
LCTM Pasir Gudang - Mechanical Repair Work At Boiler A(PK3202A). | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2019 | ||
Yakult Factory , Seremban - Piping Works. | Sri Takada Industries (M) Sdn Bhd | Yakult Malaysia Sdn Bhd | 2019 | ||
Rosek Toray Plant , Tanjung Langsat - Exhaust Line Modification Work. | Sri Takada Industries (M) Sdn Bhd | Rosek Toray Asean Malaysia | 2019 | ||
Roserk Toray Plant , Tanjung Langsat - SDP Maintenace & Shutdown Work (Piping Works). | Sri Takada Industries (M) Sdn Bhd | Rosek Toray Asean Malaysia | 2019 | ||
Petron Refinery , Port Dickson - Petron ULSADO Demolition Works. | Total Dynamic Engineering Sdn Bhd | Petron Refinery Malaysia , Port Dickson | 2019 | ||
Synthomer Plant , Pasir Gudang - Piping Works. | WHH Engineering & Construction Sdn Bhd | Synthomer Sdn Bhd | 2019 | ||
Pipe Cutting & Welding Work at GFC Sime Darby , Pasir Putih Fabrication Yard. | Pantech Corporation Sdn Bhd | Pantech Corporation Sdn Bhd | 2018 | ||
LCTM Pasir Gudang - Maintenance Works. | Sri Takada Industries (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2018 | ||
Sagami BG 2 Project - Piping Fabrication , Installation & Modification Works. | Sri Takada Industries (M) Sdn Bhd | Sagami Manufacturers Sdn Bhd | 2018 | ||
MSR Plant , Tanjung Langsat - Fabrication & Installation Work For 18" Cooling Water Line At BTX Cooling Tower Area. | Lotte E & C Malaysia Sdn Bhd | Lotte UBE Synthetic Rubber Sdn Bhd | 2016 | ||
Petronas Refinery Plant , Malacca - Procurement Of Amterial For ETS Rerounting OWS & OSW Streams To Manage Contamination Of T-6604 SWB Revamping & SMP Works. | Intra Tech Engineering & Trading Sdn Bhd | Petronas Penapisan Malacca | 2016 | ||
Kawan Food Factory , Shah Alam - Piping Fabrication & Installation Work , Equipment Installation Work. | Gasme Engineering Sdn Bhd | Kawan Food Manufacturing Sdn Bhd | 2016 | ||
BHP Refinery Plant , North Port Klang - Fabrication & Installation Work For Hydrant Sprinkle At TK-3 , Euro Pipelines Modification Work. | T,L Engineering & Trading | BHP , North Port | 2016 | ||
LCTM Pasir Gudang - Piping Fabrication , Installation & Modification Work , Others Related Miscellaneous Work. | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2016 | ||
Petronas Kemaman - EPCC Of Flare Line Replacement & Upgrading Work At TSET Area. | DC Resources Sdn Bhd | Petronas Gas Bhd , Kemaman Terengganu. | 2016 | ||
Sagami Plant At Batu Gajah , Perak - Piping Modification Works. | Sri Takada Industries (M) Sdn Bhd | Sagami Manufacturers Sdn Bhd | 2016 | ||
LCTM Pasir Gudang - EPCC Of Mechanical & Piping Works At PE 3 Plant. | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2016 | ||
LCTM Pasir Gudang - Rerouting & Demolishing Pipelines At NC1 Off Site Area. | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2016 | ||
Emery Plant - Emery S5 Extension Work(Piping Works) | Pelangi Teliti (M) Sdn Bhd | Emery Oleochemical Sdn Bhd | 2015 | ||
Petronas Kuantan - MTBE Piping & Equipment Installation Works. | Sri Takada Industries (M) Sdn Bhd | Petronas Gas Bhd , Kuantan | 2015 | ||
Petronas Kemaman - Gas , Flare Line Replacement & Upgrading Work. | Sri Takada Industries (M) Sdn Bhd | Petronas Gas Bhd , Kemaman Terengganu. | 2015 | ||
MSR Plant , Tanjung Langsat - Additional Mechanical & Piping Works. | Lotte E & C Malaysia Sdn Bhd | Lotte UBE Synthetic Rubber Sdn Bhd | 2015 | ||
LCTM Pasir Gudang - Piping Fabrication , Installation & Modification Work , Others Related Miscellaneous Work. | Sri Takada Industries (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2015 | ||
LCTM Pasir Gudang - Piping Fabrication , Installation & Modification Work , Others Related Miscellaneous Work At TPC 1. | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2015 | ||
BCPL Kochi Project - Piping & Support Pre-Fabrication Work At TKM , Bukit Rajah Fabrication Yard. | Sri Takada Industries (M) Sdn Bhd | BCPL , India | 2015 | ||
Hitachi Plant At Pasir Gudang - Piping Works | Sri Takada Industries (M) Sdn Bhd | Hitachi Chemical (Johor) Sdn Bhd | 2015 | ||
Baelocher Plant At Senawang , Seremban - Reactor & Blender Fabrication & Installation Work. | Masseng Engineering (M) Sdn Bhd | Baelocher (M) Sdn Bhd | 2015 | ||
Hershey Project At Senai , Johore - Piping Fabrication & Installation Work For CDA & Cooling Water System At Compressor Room. | Seeng Kan Air-Con Engineering Services | Hershey Malaysia Sdn Bhd | 2015 | ||
LCTM Pasir Gudang - Corroded Pipe Replacement Work At PE1-FV4001-39B , 10" Nozzle Installation Work At PE 1 , Classifier Package Replacement Work At PP1 Plant , PE2 Steam Defect Rectification , T1 Modification Work For Existing C8/LPG Header , Isolation Valve Installation Work For R-1400 & R-1410S At BTX Plant. | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2014 | ||
Petronas Prai , Penang - Piping Fabrication & Installation Work For New Flexspeed Carousel System At PDB Terminal. | Masseng Engineering (M) Sdn Bhd | Petronas Dagangan Bhd | 2014 | ||
NEGM -M3 - Demolishing & Piping Works. | Sri Takada Industries (M) Sdn Bhd | Nippon Electric Glass (M) S/B | 2014 | ||
Yakult Factory , Seremban - Expansion Of Filling & Packaging Facility (Piping Works). | Sri Takada Industries (M) Sdn Bhd | Yakult (M) Sdn Bhd | 2014 | ||
Petronas Malacca - Installation Work For Remote Elevated Monitor & 18" S/Claus Bypass Line. | Intra Tech Engineering & Trading Sdn Bhd | Petronas Penapisan Dagangan Malacca. | 2013 | ||
KLCC Project - Hotwell Tank & Piping Works. | Sri Takada Industries (M) Sdn Bhd | KLCC , Malaysia | 2013 | ||
ACFM Workshop Fabrication & Installation At Tanjung Langsat Site. | ACFM Engineering & Construction Sdn Bhd | ACFM Engineering & Construction Sdn Bhd | 2013 | ||
Hitachi Chemical Plant , Pasir Gudang - Piping Fabircation & Modification Work. | Sri Takada Industries (M) Sdn Bhd | Hitachi Chemical (JB) Sdn Bhd | 2013 | ||
MSR R1 Project - Temporary Fencing Work. | Lotte E & C Malaysia Sdn Bhd | Lotte UBE Synthetic Rubber Sdn Bhd | 2013 | ||
BHP Nort Port , Klang - Upgrading Pumpbay Piping & Tank Piping Installation Work. | T.L.Engineering & Trading | BHP , North Port Klang | 2013 | ||
LCTM Pasir Gudang - TBA Remaining Piping Works. | Lotte Chemical Titan (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2013 | ||
LCTM Pasir Gudang - EPCC For Installation Of New Z-271 Water Stripper Feed Coalescer. | Sri Takada Industries (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2013 | ||
Petronas Terengganu - Piping & Insulation Work For CDU Parallel Pre-Heat Project. | Profmech Engineering Sdn Bhd | Petronas Penapisan (Terengganu) Sdn Bhd | 2013 | ||
LCTM Project T - Final Punch & Remaining Work. | Lotte Engineering & Construction Co.Ltd | Lotte Chemical Titan (M) Sdn Bhd | 2013 | ||
LCTM Pasir Gudang - 12" IW Interconnecting Piping Replacement Work At PC 1 To PC 2. | LNC Solution Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2013 | ||
Gail Pata - Piping Prefabrication Work at TKM Bukit Rajah , Fabrication Yard. | Sri Takada Industries (M) Sdn Bhd | Gail Pata , India | 2012 | ||
Titan Pasir Gudang - New Tank Piping Tie-In Work At Terminal 3. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2012 | ||
Mathura Project - Piping Prefabrication Work at TKM Bukit Rajah , Fabrication Yard. | Sri Takada Industries (M) Sdn Bhd | IOCL Mathura | 2012 | ||
Q-Project(SIG) - Equipment Installation & Piping Works. | Sri Takada Industries (M) Sdn Bhd | Iwantani Malaysia Sdn Bhd | 2012 | ||
KLIA 2 - Piping Work For District Cooling Plant. | Sri Takada Industries (M) Sdn Bhd | KLIA 2 (Kuala Lumpur International Airport 2) | 2012 | ||
Titan Pasir Gudang - (Project T) Fire Water Ring Pipe Work. | Special Triumph Sdn Bhd | Titan Petchem Malaysia | 2012 | ||
Titan Pasir Gudang - Piping Work For 2H-116 At TPC 2. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2012 | ||
Yakult Factory , Seremban - New Ice Bank System Extension Piping Work. | Sri Takada Industries (M) Sdn Bhd | Yakult (M) Sdn Bhd | 2012 | ||
Gail Vijapur Project - Piping Pre-Fabrication Work At TKM Bukit Rajah Fabrication Yard. | Sri Takada Industries (M) Sdn Bhd | Gail Vijapur , India | 2012 | ||
Fabrication Work For 1 Unit Dismounted Bolted Tank At GFC Fabrication Yard , Port Dickson. | Tandex Chemical Sdn Bhd | Tandex Chemical Sdn Bhd | 2012 | ||
KLIA 2 Maintenance - DC Line Fabrication & Installation Work. | Sri Takada Industries (M) Sdn Bhd | KLIA 2 (Kuala Lumpur International Airport 2) | 2012 | ||
BPCP Project - Piping Pre-Fabrication Work At TKM Bukit Rajah Fabrication Yard. | Sri Takada Industries (M) Sdn Bhd | BPCP Brahmaputra , India | 2012 | ||
Pneumatic Layout Packing Line At Air Product , Johore. | Teganas Sdn Bhd | Air Product Johor | 2011 | ||
Titan Pasir Gudang - EPCC Services , AMIAD Filter System Installation Work At BD & BTX Cooling Plant. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2011 | ||
Titan Pasir Gudang - Tank Repair Work (TK 4 - 2PK-500) . | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2011 | ||
Titan Pasir Gudang - Metal Canister Fabrication For Rotor & Turbine Rotor. | Kejuruteraan SBC (M) Sdn Bhd | Titan Petchem Malaysia | 2011 | ||
NEGM M5- Binder Filtering System Installation Work & Maintenenace Work. | Sri Takada Industries (M) Sdn Bhd | Nippon Electric Glass (M) S/B | 2011 | ||
Titan Pasir Gudang - New Polish Condensate Pump Installation Work At 2P-3203B , TPC 1. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2011 | ||
Fitting Fabrication Work At Grace Field Pasir Putih Workshop. | Pantech Corporation Sdn Bhd | Pantech Corporation Sdn Bhd | 2011 | ||
Esterol Plant - Fabrication & Installation Work For Pipe Suction & Discharge Line. | Esterol Sdn Bhd | Esterol Sdn Bhd | 2011 | ||
Piping Welding Work At Pantech Steel Plant , PKFZ Meru Klang. | Pantech Steel Industries Sdn Bhd | Pantech Steel Industries Sdn Bhd | 2011 | ||
Rectification Work At Gumus Kakap . | Badek Resources Sdn Bhd | Gumusut Kakap | 2010 | ||
Titan Pasir Gudang - DC Line Y-Type 3 Ways Ball Valve Installation Work At PE 3 Plant. | Kejuruteraan SBC (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - Fabrication & Installation Work For 3" Demin Water Line At Cracker 2 Plant. | LNC Solutions Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - Xexane & Butane Line Replacement Work. | DC Resources Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
2" Air Line Installation Work At Pasir Gudang. | Leeden Welding Sdn Bhd | CRC-Evans Automatic Welding | 2010 | ||
Kempas Edible Oil Plant - Steam Valve Replacement Work. | GIS Supply & Engineering Sdn Bhd | Kempas Edible Oil Sdn Bhd | 2010 | ||
Titan Pasir Gudang - Oil Filter Installation , Discharge Line Repair , Tank Roof Repair(TK-5100A) & Painting Work At Terminal 1 , Relocate Of 4" Fire Water Line At Terminal 3. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - Valve Replacement & Piping Modification Work At HRSG Area. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - EPCC For New HHX Line Installation Work At PE Plant . Steel Structure , Support , Frame Fabrication & Replacement Work For Corroded Units At Cogen Demin Plant. | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
Kempas Edible Oil Plant - Piping Works. | GIS Supply & Engineering Sdn Bhd | Kempas Edible Oil Sdn Bhd | 2010 | ||
Piping & Assembly Work For Sanitary Waste Water Treatment Square Tank At TKM Bukit Raja Fabrication Yard. | Sri Takad Industries (M) Sdn Bhd | Toray Industrial Malaysia Sdn Bhd | 2010 | ||
Titan Pasir Gudang - Construct a Dike At TPP-D760 & BD Underground 1 1/2" & 2" Drain Line Leakage Repair Work. | DC Resources Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - Procurement & Construction Services For New 68 M3/H LPG Feed Pump Installation Work At Cracker 1 Off-Site. | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - EPCC Work For Fuel Gas Line To HRSG BMS At Co-Gen Area. | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - Pipe Support Repair Work At T101 Terminal 2 , 18" Naptha Line Repair Work At BT 1. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2010 | ||
Esterol Plant - Maintenance Work. | Esterol Sdn Bhd | Esterol Sdn Bhd | 2010 | ||
Titan Pasir Gudang - Underground Piping Work For 8" Drain Header At BD Plant , Rehabilition Of Condensate Skid At Cracker 2 Utility Area. | DC Resources Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - Demin Water Piping Work , Shelter Fabrication & Installation For Boiler G & H . | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - SUS Piping Installation Work For Extruder OP Injection Line At PP 1 Plant. | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - New 10" Valve Installation Work At PC 1. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2010 | ||
Esterol Heat Box Project - Piping Fabrication & Installation Works At Tankfarm Plant. | Esterol Sdn Bhd | Esterol Sdn Bhd | 2010 | ||
GGSR Project - Additional Piping Fabrication Work At TKM Bukit Raja Fabrication Yard. | Sri Takad Industries (M) Sdn Bhd | GGSR(Guru Gobind Sigh Refinery) , India | 2010 | ||
Titan Pasir Gudang - Emergency Shower & Eye Easher Installation Work At Cracker 2 Plant. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - Piping Works For Naptha Pump Drain Line At Terminal 1. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - Piping Modification Work At FT-412 A/B , HDPE Plant. | Yokogawa Electric (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
Titan Pasir Gudang - Deluge System Installation Work For Pump P-210 & 2P-210 At Cracker 1 & Cracker 2. | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | ||
Petronas Labuan , Sabah - Equipment & Piping Dismantling Work At ASU Area . | Eastern Soldar Engineering & Construction Sdn Bhd | Petronas Methanol Labuan | 2009 | ||
Titan Pasir Gudang - TPP Package (Access Platform Construction Work) | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - 6" Underground Pipe Line Leaking Repair Work At Terminal 2. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - Condensate By Pass Line Fabrication & Installation Work At C650T & V941B . | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang -New Pump Based Plate , Structural Fabrication & Installation Work For P501 At Terminal 2. | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - Underground Piping Work At BD Plant. | DC Resources Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - New Platform , Structural Fabrication & Installation Work At Terminal Jetty. | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - Fabrication & Installation Work For Quench Water Blow Down Line. | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - Fabrication & Installation Work For New Bypass Line & Condensate Line . | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - Refurbishment Of C2 Line Support & Bolting Due To Heavily Corroded At Terminal 2. | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
GGSR Project - Piping Fabrication Work At TKM Bukit Raja Fabrication Yard. | Sri Takad Industries (M) Sdn Bhd | GGSR(Guru Gobind Sigh Refinery) , India | 2009 | ||
Pantech Steel PKFZ , Meru Klang - Welding Work . | Pantech Steel Industries Sdn Bhd | Pantech Steel Industries Sdn Bhd | 2009 | ||
Titan Pasir Gudang - Piping Works At TPC 2. | Sri Takad Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Petronas Malacca - Piping Work For MG 3 & HPU-2 Jumoer Line , 14" Cement Coated Pipe & New Piping Works. | Intra Tech Engineering & Trading Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Kempas Edible Oil - 4" Nozzle Installation Work. | GIS Supply & Engineering Sdn Bhd | Kempas Edible Oil Sdn Bhd | 2009 | ||
Titan Pasir Gudang - Control Valve Installation At TPC 1. | GIS Supply & Engineering Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Hudang - Piping Works For PE1-C2 Purge Header. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - Piping Works For Cooling Water By-Pass Line To C-600T. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang -Piping Work For Additional CBD Line From BD Pit To Observation Pond & Upgraded TT-560. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - Buffer Gas Piping Fabrication & Installation Work At PE 1 Plant. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Johor Port Tanjung Langsat - 3" & 6" SUS Piping Fabrication & Installation Work. | Kejuruteraan Sri Lukut | Johor Port Bhd | 2009 | ||
Titan Pasir Gudang - New Pump Based Plate Structural Fabrication & Installation Work. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - 10" CWS Piping Fabrication & Installation Work At TPC 1. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
POK Transform Project - Internal Piping Fabrication & Installation Work At North Port , Klang. | Pelangi Teliti (M) Sdn Bhd | Palm Oil (Klang ) Sdn Bhd | 2009 | ||
Titan Pasir Gudang - Piping Work For Furnace H-114 Check Valve Leakage At PC 1 Plant. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - Piping Modification Work At Fresh Water Pressure Tank Area. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - Piping Fabrication & Installation Work , Removal Work At Pressurized Propylene(C3) Export Facility , BT3 Jetty. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - Pre-Commissioning Work , Piping Works , Equipment & Structural Modification Work For Boilr G. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2209 | ||
Titan Pasir Gudang - Boiler Dismantle & Installation Work . | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Petronas Malacca -CRU-1 LPG Chloride Treater Vessel Installation Work , Piping Works , Assembly & Installation , Commissioning Work For Fin Cooler E-1129. | Intra Tech Engineering & Trading Sdn Bhd | Petronas Dagangan Bhd | 2009 | ||
Petronas Prai , Penang - Piping Work At LPG Bottling Plant . | Masseng Engineering Sdn Bhd | Petronas Dagangan Bhd | 2009 | ||
Titan Pasir Gudang - EPCC Services(New Demin Water Pumps P-330B & 2P-3301B Installation Work At Cracker 1 & 2 Plant , Utility Area. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2009 | ||
Titan Pasir Gudang - EPCC Services For Cooling Water Backflush Facilities To Selected Heat Exchangers At TPC 1 & TPC 2 Plant . | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2008 | ||
Titan Pasir Gudang - Cable Tray Installation At TPC 1 & TPC 2. | GIS Supply & Engineering Sdn Bhd | Titan Petchem Malaysia | 2008 | ||
Titan Pasir Gudang - Piping Modification Work For 2EX-801 Extruder Revamping , Silo Platform Fabrication & Installation. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2008 | ||
Titan Pasir Gudang - Replace Existing Jockey Pump P-5602 A/S To New Pumps At Cracker 1 Plant Utility Area. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2008 | ||
Titan Pasir Gudang -Piping Works At Terminal 1 . | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2008 | ||
Ptitan Pasir Gudang - Additional Work For EPCc Services Of Naptha Pump Installation At Terminal 1 . | Kejuruteraan Sri Lambaian Sdn Bhd | Titan Petchem Malaysia | 2008 | ||
Titan Pasir Gudang - Fitting Replacement Work At PCR 1 & PCR 2 . | Tyco Fire , Security & Services (M) Sdn Bhd | Titan Petchem Malaysia | 2008 | ||
Yakult Factory Seremban Plant Extension - Piping Fabrication & Installation Work. | Sri Takada Industries (M) Sdn Bhd | Yakult Malaysia Sdn Bhd | 2008 | ||
Esterol Plant - Welding Repair Work At Thermal Oil Heater Battery & Hot Oil System Area. | Ikatan Engineering Sdn Bhd | Esterol Sdn Bhd | 2008 | ||
Petronas Prai - Piping Work At LPG Bottling Plant. | Intra Tech Engineering & Trading Sdn Bhd | Petronas Dagangan Bhd | 2008 | ||
Titan Pasir Gudang - Renewal Of New Flange Type Steam Traps At Cracker 1 & 2 . | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2008 | ||
Titan Pasir Gudang - Piping Works For Mixed C4 Pipeline & Pump Flow Line . | Kejuruteraan Sri Lambaian Sdn Bhd | Titan Petchem Malaysia | 2008 | ||
Titan Pasir Gudang - EPCC Of PP Plant Debottlenecking Project At PP 1 & PP 2 Plant (Piping Works) . | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2008 | ||
Titan Pasir Gudang - Relocate Work For Pump P-210A . | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2008 | ||
Kulim Hitech Project - 10" N2 Line Installation Work(3KM). | Kejuruteraan Sri Lambaian Sdn Bhd | Air Product Malaysia Sdn Bhd | 2008 | ||
TKM Head Office Shop Fabrication Works At Bukit Raja , Shah Alam. | Sri Takada Industries (M) Sdn Bhd | Sri Takada Industries (M) Sdn Bhd | 2007 | ||
Titan Pasir Gudang - Procurement , Construction & Testing Of Gas Compressor(C-301) 1st Stage Discharge By-Pass Line At PP1 Plant. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2007 | ||
Titan Pasir Gudang - EPCC For 2P-565N A/S Pump Replacement Work. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2007 | ||
Titan Pasir Gudang - Pressure Control Valve(2PV-0103) Modification Work At Naptha Header , TPC 2. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2007 | ||
Titan Pasir Gudang - Piping Works For LPG Cracking Project. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2007 | ||
Esterol Plant , Shah Alam - Heat Exchanger Installation & Piping Works. | Sri Takada Industries (M) Sdn Bhd | Esterol Sdn Bhd | 2007 | ||
Titan Pasir Gudang - Relocate Existing Pump P-210A From Terminal 2 To TPC 1 LPG. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2007 | ||
WQT Gas Treatment Piping Works. | Sri Takada Industries (M) Sdn Bhd | Toyo Tyres Malaysia | 2007 | ||
Titan Petchem Pasir Gudang -Steel Structural Work For EPCC Of Cracker Gas Knocout Drum , 2V-346B Cracker 2 Plant. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2007 | ||
TitanPetchem Pasir Gudang - 6" Stainless Steel Pipe Spool Installation Work At 2R200 Prepoly Reactor Area. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2007 | ||
KLIA - Piping Installation Work For Underground Chilled Water & Return Pipeline. | Ricwill (M) Sdn Bhd | KLIA(Kuala Lumpur International Airport) | 2007 | ||
NEGM-M11T 32 BU Extension Project - Bushing & Winder Piping Work , Others Related Miscellaneous Work. | Sri Takada Industries (M) Sdn Bhd | Nippon Electric Glass (M) S/B | 2006 | ||
Titan Petchem Pasir Gudang - Plant Water(PLW) Piping Replacement Work At LDPE Plant. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2006 | ||
Caltex Pulau Indah Terminal - Tank (No.807 ) Repair Work. | Cericon (M) Sdn Bhd | Caltex Port Klang , Pulau Indah | 2006 | ||
NEGM-M11 T - Piping Works. | Sri Takada Industries (M) Sdn Bhd | Nippon Electric Glass (M) S/B | 2006 | ||
Titan Petchem Pasir Gudang - EPCC Of New Naptha Pump Installation Work & Cracker Plate Renewal At Terminal 1. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2006 | ||
Caltex Pasir Gudang & Prai Terminal - Tank Repair & Ancillary Work. | Cericon (M) Sdn Bhd | Caltex Pasir Gudang & Prai , Penang | 2006 | ||
Titan Petchem Pasir Gudang - Piping Work. | Cal Engineering & Industrial Services Sdn Bhd | Titan Petchem Malaysia | 2005 | ||
NEGM M3 - Piping Work for Press Machine & Cold End Plug Pump Modification & Shear Spray Suction. | Sri Takada Industries (M) Sdn Bhd | Nippon Electric Glass (M) S/B | 2005 | ||
Piping Fabrication & Installation Work . | Kejuruteraan Sri Lukut | Cognis Rika (M) Sdn Bhd | 2005 | ||
Putra Jaya DCS Plant 1 Expansion Project - Chiller Package Stage 3 & 4 OS & LG Piping Modification Work. | Sri Takada Industries (M) Sdn Bhd | GDC Putrajaya | 2005 | ||
Clatex Terminal At Prai Penang - Tank Repair & Ancillary Works. | Cericon (M) Sdn Bhd | Caltex Mobile , Prai | 2005 | ||
Titan Pasir Gudang - 1" New Fuel Gas Pipeline Installation & Modification Work(From TPC flare To TPP 2 Flue Gas-6" HS Line). | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2005 | ||
Petronas Malacca - 14" Acid Crude Line Fabrication & Installation Work. | Intra Tech Engineering & Trading Sdn Bhd | Petronas Penapisan Malacca | 2004 | ||
Seraya Power Station - Shop Fabrication Work. | Sri Takada Industries (M) Sdn Bhd | Seraya Power Station , Singapore | 2004 | ||
Titan TPE 1 Hot Oil System - Upgrading Work For TPC 2 Pumpback Facility & Piping Work. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2004 | ||
Johor Port , Pasir Gudang - Marine Loading Arm Installation. | Cericon (M) Sdn Bhd | Johor Port Bhd | 2004 | ||
Panglima Power Station , Malacca - Civil & Mechanical Assistance Work for HDPE Pipe Remedial Works. | Ballast Nedam International (M) Sdn Bhd | Panglima Power Station | 2004 | ||
Samsung SDI , Senawang Seremban - Piping Works For PCW Return. | Samsung SDI (M) Bhd | Samsung SDI (M) Bhd | 2003 | ||
Rikevita , Pasir Gudang - Piping & Equipment Installation Work. | Sri Takada Industries (M) Sdn Bhd | Rikevita (Malaysia) Sdn Bhd | 2003 | ||
Liquid Handling Facilities Project - Piping & Equipment Installation Work. | Sri Takada Industries (M) Sdn Bhd | Petronas Gas Malaysia | 2003 | ||
Johor Port , Pasir Gudang - Pipeline Construction Work for Mixed C4 Export Facility Via DCJ4. | Cericon Sdn Bhd | Johor Port Bhd | 2003 | ||
Proton City Tanjung Malim - Piping Installation Work , Assembly & Others Related Works. | Lantec Far East Sdn Bhd | Proton City Tanjung Malim | 2003 | ||
Chiller Piping Fabrication & Installation Work At Putra Jaya. | Sri Takada Industries (M) Sdn Bhd | GDC Putrajaya | 2002 | ||
Sagami SU 2 Project At Batu Gajah , Perak - Piping & Support Works | Sri Takada Industries (M) Sdn Bhd | Sagami Manufacturers Sdn Bhd | 2001 | ||
Petronas Malacca PSR 2 Project - Desalter Piping Modification Work. | Intra Tech Engineering & Trading Sdn Bhd | Petronas Penapisan Malacca | 2000 | ||
Fire Fighting System & ASA Defect Rectification Work. | Pahlawan Power Sdn Bhd | Powertec | 1999 | ||
SNBT - Outdoor Tank Yard Piping Work. | Sri Takada Industries (M) Sdn Bhd | SNBT | 1998 | ||
Hitachi Pasir Gudang - Piping Work. | Sri Takada Industries (M) Sdn Bhd | Hitachi Chemical (Johor) Sdn Bhd | 1997 | ||
Construction & Completetion Of Silo & Supporting Steel Structure At Johore Bahru. | Malaysian Sheet Glass Bhd | Malaysian Sheet Glass Bhd | 1997 | ||
Structural Work For PT Riau Andalan Pulp & Paper Wood Handling Project - Structural Fabrication Work . | Dymax Engineering Sdn Bhd | PT Riau Andalan , Indonesia | 1997 | ||
Piping Modification & Maintenance Work At Petronas Depot Kuantan | Fonco Sdn Bhd | Petronas Depot , Kuantan | 1995 |