TA Work Value : RM 100,000.00 – RM 15,000,000.00
Turnaround Work Descriptions | Clients | Owner | Period | |
---|---|---|---|---|
LCTM Pasir Gudang TA 2024 : -NC2 Modification Package -NC2 & Utility Defect & CUI Package -Defect Package (BD,BTX,TBA,OCU & GHU ) | Lotte Chemical Titan (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Feb'2024 - Sept'2024 | |
Heng Yuan(HRC Major TA2023) - Shell Refinery Maintenance & Turnaround Work At Port Dickson. | Ekoswasta Sdn Bhd/CCIE | Heng Yuan (Shell ) Refinery, Port Dickson | Jun'2023-Jul'2023 | |
LCTM Pasir Gudang - Furnace 2H-116 Structure Repairing Work | Lotte Chemical Titan (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Apr'2020 - Jun'2020 | |
LCTM Pasir Gudang TA2020 Shut Down Work -BD-OCU , OCU & GHU2 Plant Stub Tie-In Works | Lotte Chemical Titan (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Feb'2020 - Apr'2020 | |
LCTM Pasir Gudang , TA2020 : Hot Work & Mechanical Work(NC 2 & Utility Defect Package , Monomer Package). | JLM Tech Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Feb'2020 - Apr'2020 | |
LCTM Pasir Gudang FNC TA2020 Minor Modification Shutdown Work. | Sri Takada Industries (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Dec'2019 - Mar'2020 | |
LCTM Furnace Shutdown Work( 2H-116 & H-112.) & PP3 TA2019. | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | Aug'2019 - Dec'2019 | |
Petronas Refinery , Malacca - Euro 5 Shutdown Work | Intra Tech Engineering & Trading Sdn Bhd | Petronas Penapisan Malacca | Aug'2019-Oct'2019 | |
LCTM Pasir Gudang -(Engineering Modification Work For FNC TA2019) Piping & Mechanical Work. | Sri Takada Industries (M) Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2019 | |
LCTM Pasir Gudang - Furnace Maintenance & Shutdown Work For H-110 , H-112 , H-113 & 2H-114. | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2018 | |
Heng Yuan(HRC Major TA2018) - Shell Refinery Maintenance & Turnaround Work At Port Dickson. | Total Dynamic Engineering Sdn Bhd | Heng Yuan (Shell ) Refinery, Port Dickson | 2018 | |
Rosek Toray Shutdown Work At Tanjung Langsat. | Sri Takada Industries (M) Sdn Bhd | Rosek Toray Asean Malaysia | 2018 | |
Petronas Refinery Malacca - Pipig Works For Petronas 2015 Shutdown Project & QMI2-Blend To Ship Project. | Intra Tech Engineering & Trading Sdn Bhd | Petronas Penapisan Malacca | 2015 | |
LCTM Pasir Gudang , Furnace Shutdown Project - HPWJ Cleaning For H110 Urgent Cleaning Work , Radiant Coil Cutting & Replacement Work (H113) , Convection Pipe Unplugging & Isolation Valve Installation Work. | WHH Engineering & Construction Sdn Bhd | Lotte Chemical Titan (M) Sdn Bhd | 2014 | |
Petronas Refinery , Terengganu - Nozzle Modification Work , Rejuvenation & Revamping Plant. | Terang Asia Sdn Bhd | Petronas Penapisan (Terengganu) Sdn Bhd | 2013 | |
Titan Petchem Pasir Gudang - Furnace Shutdown Work(2H-112 , 2H113 & 2H114). | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2012 | |
Petronas Refinery , Malacca - PSR-2(Phase 2 Shutdown Work) Crude Tank Water Draining Facilities Project. | Intra Tech Engineering & Trading Sdn Bhd | Petronas Penapisan Malacca | 2012 | |
Titan Petchem Pasir Gudang - Furnace Shutdown Work(H110,H111,H112 , H113 & H114). | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2011 | |
Titan Petchem Pasir Gudang - EPCC To Install New E-376 C2 Reactor Feed Heater At Cracker 1 Plant | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2011 | |
Titan Petchem Pasir Gudang - Furnace H-111 Coil Shortening Convection Support Replacement & Associate Works At TPC 1. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2011 | |
Titan Petchem Pasir Gudang - Minor Modification Work(Package2)- TA Shutdown. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2011 | |
Titan Petchem Pasir Gudang - Titan June'2011 TA Project , E-555 Condensor Installation Work At TPC 1. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2011 | |
Titan Petchem Pasir Gudang - Furnace H-114 Coil Shortening & Standard Mechanical Works. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2011 | |
Titan Petchem Pasir Gudang - Decoke Line Fabrication & Rejuvinate , Corrosion Rectification Work At PE 1. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2011 | |
Titan Petchem Pasir Gudang - Minor Modification Work(Package 3)- TA Shutdown. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2011 | |
Titan Petchem Pasir Gudang - PP1 , PP 2 & PE1 Defect Piping Works. | KWH Technologies Sdn Bhd | Titan Petchem Malaysia | 2011 | |
Titan Petchem Pasir Gudang - Furnace H-111 & H110 Shutdown Work. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Petchem Pasir Gudang - 2" & 3" C2 Retreatment Line /2" Vent Replacement & Installation Work | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Petchem Pasir Gudang - Furnace H110(Z2) Coil Replacement Work. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Petchem Pasir Gudang - Cracker PC-2 TA2010 , Deaerator Heater(2PK-3200) Piping Fabrication & Installation Work. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Petchem Pasir Gudang - Furnace Shutdown Maintenance Work At TPC 1. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Petchem Pasir Gudang - Piping Work For Furnace 2H-110 Effluent Decoke Line & Furnace H-113 Shutdown Work. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Petchem Pasir Gudang - Boiler H Reparing Work. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Petchem Pasir Gudang - Piping Works For PP1 Plant Shutdown. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Petchem Pasir Gudang - Defect List Project(Steam Trap , Miscellaneous Repair & Rectification Work) | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Petchem TA 2010 - Piping Works At TPC 2 & BTX Plant. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Petchem Pasir Gudang - R-5300 Oxidation Reactor Installation At PC 1 , Utility Area. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | |
PFKSB Plant , Keadah - Plant Debottlenecking Project , EPCC Gas turbine Congeneration System Shutdown Work. | Sri Takada Industries (M) Sdn Bhd | Petronas Chemical Fertiliser Keadah Sdn Bhd | 2010 | |
Titan Petchem Pasir Gudang - Pipig Works For PE 1 Shutdown. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Petchem Pasir Gudang - Decoke Line Fabrication & Installation Work. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2010 | |
Titan Petchem Pasir Gudang - AMIAD Filtration System Installation WorkFor Cooling Water Make-Up At TPC 1 & TPC 2. | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2010 | |
Petronas Refinery , Malacca - Piping Works For Revamping Project. | Kejuruteraan Sri Lambaian Sdn Bhd | Petronas Penapisan Malacca | 2010 | |
Titan Petchem Pasir Gudang - Pipe Support Repair At Dyke Area , Neutralization Tan Support & Pipe Support Replacement Work At PC-2. | Kejuruteraan SBC (M) Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Petronas Refinery , Malacca - Piping Work For PSR-2 Revamping Project At Unit 35 & 58. | Intra Tech Engineering & Trading Sdn Bhd | Petronas Penapisan Malacca | 2010 | |
Petronas Refinery , Malacca - (Revamping Project) Piping Installation Work For Interconnecting System Process Area. | Intra Tech Engineering & Trading Sdn Bhd | Petronas Penapisan Malacca | 2010 | |
Petronas Labuan - PMLSB/TA/Shutdown Project(Piping Fabrication , Installation & Modification Work ,Tie-In Work). | Eastern Soldar Engineering & Construction Sdn Bhd | Petronas Methanol Labuan | 2010 | |
Titan Petchem Pasir Gudang - Hexane & Butane Piping Relacement Work. | DC Resources Sdn Bhd | Titan Petchem Malaysia | 2010 | |
Titan Pecthem Pasir Gudang - Furnace 2H-113 (Z7) , Piping Fabrication & Installation Work , Coil Shortening & Replace HPSS Convection Coil . | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2009 | |
Titan Pecthem Pasir Gudang - (Oct'2009 Plant Shutdown)Defect Rectification Work At PE 2 Plant. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2009 | |
Titan Petchem Pasir Gudang - Furnace Shutdown Works. | Wing Hup Hing Engineering & Construction Sdn Bhd | Titan Petchem Malaysia | 2008 | |
Titan Petchem Pasir Gudang - 2H-114 (Z10) Furnace Shutdown (Coil , Tube & Boiler Plate Replacement Work). | Kejuruteraan Sri Lukut | Titan Petchem Malaysia | 2008 | |
Titan Pecthem Pasir Gudang - Water Treatment Plant Piping Fabrication & Installation Work , Piping Tie-In Work. | CCM Water Systems Sdn Bhd | Titan Petchem Malaysia | 2008 | |
Titan Petchem , Pasir Gudang - EPCC Of Services BFW Injection Facility At TPC 1 , Furnace Shutdown & Piping Works At TPP2 Finishing Plant. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2007 | |
Titan Petchem , Pasir Gudang - Furnace H-11 Piping Fabrication & Installation Works | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2006 | |
Titan Petchem , Pasir Gudang - TPC 1 TA2006 Defect List Package - Valve , Piping & Platform Replacement , Cracker Gas Transfer Piping For Inter Connecting Piping Work From TPC 2 To TPC 1. | Sri Takada Industries (M) Sdn Bhd | Titan Petchem Malaysia | 2006 |