Turnaround

TA Work Value : RM 100,000.00 – RM 15,000,000.00

Turnaround
Work Descriptions
Clients Owner Period  
LCTM Pasir Gudang TA 2024 :
-NC2 Modification Package
-NC2 & Utility Defect & CUI Package
-Defect Package (BD,BTX,TBA,OCU & GHU )
Lotte Chemical Titan (M) Sdn BhdLotte Chemical Titan (M) Sdn BhdFeb'2024 - Sept'2024
Heng Yuan(HRC Major TA2023) - Shell Refinery Maintenance & Turnaround Work At Port Dickson.Ekoswasta Sdn Bhd/CCIEHeng Yuan (Shell ) Refinery, Port DicksonJun'2023-Jul'2023
LCTM Pasir Gudang - Furnace 2H-116 Structure Repairing WorkLotte Chemical Titan (M) Sdn BhdLotte Chemical Titan (M) Sdn BhdApr'2020 - Jun'2020
LCTM Pasir Gudang TA2020 Shut Down Work -BD-OCU , OCU & GHU2 Plant Stub Tie-In WorksLotte Chemical Titan (M) Sdn BhdLotte Chemical Titan (M) Sdn BhdFeb'2020 - Apr'2020
LCTM Pasir Gudang , TA2020 : Hot Work & Mechanical Work(NC 2 & Utility Defect Package , Monomer Package).JLM Tech Sdn BhdLotte Chemical Titan (M) Sdn BhdFeb'2020 - Apr'2020
LCTM Pasir Gudang FNC TA2020 Minor Modification Shutdown Work.Sri Takada Industries (M) Sdn BhdLotte Chemical Titan (M) Sdn BhdDec'2019 - Mar'2020
LCTM Furnace Shutdown Work( 2H-116 & H-112.) & PP3 TA2019.WHH Engineering & Construction Sdn BhdLotte Chemical Titan (M) Sdn BhdAug'2019 - Dec'2019
Petronas Refinery , Malacca - Euro 5 Shutdown WorkIntra Tech Engineering & Trading Sdn BhdPetronas Penapisan MalaccaAug'2019-Oct'2019
LCTM Pasir Gudang -(Engineering Modification Work For FNC TA2019) Piping & Mechanical Work.Sri Takada Industries (M) Sdn BhdLotte Chemical Titan (M) Sdn Bhd2019
LCTM Pasir Gudang - Furnace Maintenance & Shutdown Work For H-110 , H-112 , H-113 & 2H-114.WHH Engineering & Construction Sdn BhdLotte Chemical Titan (M) Sdn Bhd2018
Heng Yuan(HRC Major TA2018) - Shell Refinery Maintenance & Turnaround Work At Port Dickson.Total Dynamic Engineering Sdn BhdHeng Yuan (Shell ) Refinery, Port Dickson2018
Rosek Toray Shutdown Work At Tanjung Langsat.Sri Takada Industries (M) Sdn BhdRosek Toray Asean Malaysia2018
Petronas Refinery Malacca - Pipig Works For Petronas 2015 Shutdown Project & QMI2-Blend To Ship Project.Intra Tech Engineering & Trading Sdn BhdPetronas Penapisan Malacca2015
LCTM Pasir Gudang , Furnace Shutdown Project - HPWJ Cleaning For H110 Urgent Cleaning Work , Radiant Coil Cutting & Replacement Work (H113) , Convection Pipe Unplugging & Isolation Valve Installation Work.WHH Engineering & Construction Sdn BhdLotte Chemical Titan (M) Sdn Bhd2014
Petronas Refinery , Terengganu - Nozzle Modification Work , Rejuvenation & Revamping Plant.Terang Asia Sdn BhdPetronas Penapisan (Terengganu) Sdn Bhd2013
Titan Petchem Pasir Gudang - Furnace Shutdown Work(2H-112 , 2H113 & 2H114).Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2012
Petronas Refinery , Malacca - PSR-2(Phase 2 Shutdown Work) Crude Tank Water Draining Facilities Project.Intra Tech Engineering & Trading Sdn BhdPetronas Penapisan Malacca2012
Titan Petchem Pasir Gudang - Furnace Shutdown Work(H110,H111,H112 , H113 & H114).Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2011
Titan Petchem Pasir Gudang - EPCC To Install New E-376 C2 Reactor Feed Heater At Cracker 1 PlantWing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2011
Titan Petchem Pasir Gudang - Furnace H-111 Coil Shortening Convection Support Replacement & Associate Works At TPC 1.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2011
Titan Petchem Pasir Gudang - Minor Modification Work(Package2)- TA Shutdown.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2011
Titan Petchem Pasir Gudang - Titan June'2011 TA Project , E-555 Condensor Installation Work At TPC 1.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2011
Titan Petchem Pasir Gudang - Furnace H-114 Coil Shortening & Standard Mechanical Works.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2011
Titan Petchem Pasir Gudang - Decoke Line Fabrication & Rejuvinate , Corrosion Rectification Work At PE 1.Sri Takada Industries (M) Sdn BhdTitan Petchem Malaysia2011
Titan Petchem Pasir Gudang - Minor Modification Work(Package 3)- TA Shutdown.Sri Takada Industries (M) Sdn BhdTitan Petchem Malaysia2011
Titan Petchem Pasir Gudang - PP1 , PP 2 & PE1 Defect Piping Works.KWH Technologies Sdn BhdTitan Petchem Malaysia2011
Titan Petchem Pasir Gudang - Furnace H-111 & H110 Shutdown Work.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2010
Titan Petchem Pasir Gudang - 2" & 3" C2 Retreatment Line /2" Vent Replacement & Installation WorkWing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2010
Titan Petchem Pasir Gudang - Furnace H110(Z2) Coil Replacement Work.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2010
Titan Petchem Pasir Gudang - Cracker PC-2 TA2010 , Deaerator Heater(2PK-3200) Piping Fabrication & Installation Work.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2010
Titan Petchem Pasir Gudang - Furnace Shutdown Maintenance Work At TPC 1.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2010
Titan Petchem Pasir Gudang - Piping Work For Furnace 2H-110 Effluent Decoke Line & Furnace H-113 Shutdown Work.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2010
Titan Petchem Pasir Gudang - Boiler H Reparing Work.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2010
Titan Petchem Pasir Gudang - Piping Works For PP1 Plant Shutdown.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2010
Titan Petchem Pasir Gudang - Defect List Project(Steam Trap , Miscellaneous Repair & Rectification Work)Sri Takada Industries (M) Sdn BhdTitan Petchem Malaysia2010
Titan Petchem TA 2010 - Piping Works At TPC 2 & BTX Plant.Sri Takada Industries (M) Sdn BhdTitan Petchem Malaysia2010
Titan Petchem Pasir Gudang - R-5300 Oxidation Reactor Installation At PC 1 , Utility Area.Sri Takada Industries (M) Sdn BhdTitan Petchem Malaysia2010
PFKSB Plant , Keadah - Plant Debottlenecking Project , EPCC Gas turbine Congeneration System Shutdown Work.Sri Takada Industries (M) Sdn BhdPetronas Chemical Fertiliser Keadah Sdn Bhd2010
Titan Petchem Pasir Gudang - Pipig Works For PE 1 Shutdown.Sri Takada Industries (M) Sdn BhdTitan Petchem Malaysia2010
Titan Petchem Pasir Gudang - Decoke Line Fabrication & Installation Work.Kejuruteraan Sri LukutTitan Petchem Malaysia2010
Titan Petchem Pasir Gudang - AMIAD Filtration System Installation WorkFor Cooling Water Make-Up At TPC 1 & TPC 2.Kejuruteraan Sri LukutTitan Petchem Malaysia2010
Petronas Refinery , Malacca - Piping Works For Revamping Project.Kejuruteraan Sri Lambaian Sdn BhdPetronas Penapisan Malacca2010
Titan Petchem Pasir Gudang - Pipe Support Repair At Dyke Area , Neutralization Tan Support & Pipe Support Replacement Work At PC-2.Kejuruteraan SBC (M) Sdn BhdTitan Petchem Malaysia2010
Petronas Refinery , Malacca - Piping Work For PSR-2 Revamping Project At Unit 35 & 58.Intra Tech Engineering & Trading Sdn BhdPetronas Penapisan Malacca2010
Petronas Refinery , Malacca - (Revamping Project) Piping Installation Work For Interconnecting System Process Area.Intra Tech Engineering & Trading Sdn BhdPetronas Penapisan Malacca2010
Petronas Labuan - PMLSB/TA/Shutdown Project(Piping Fabrication , Installation & Modification Work ,Tie-In Work).Eastern Soldar Engineering & Construction Sdn BhdPetronas Methanol Labuan2010
Titan Petchem Pasir Gudang - Hexane & Butane Piping Relacement Work.DC Resources Sdn BhdTitan Petchem Malaysia2010
Titan Pecthem Pasir Gudang - Furnace 2H-113 (Z7) , Piping Fabrication & Installation Work , Coil Shortening & Replace HPSS Convection Coil .Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2009
Titan Pecthem Pasir Gudang - (Oct'2009 Plant Shutdown)Defect Rectification Work At PE 2 Plant.Sri Takada Industries (M) Sdn BhdTitan Petchem Malaysia2009
Titan Petchem Pasir Gudang - Furnace Shutdown Works.Wing Hup Hing Engineering & Construction Sdn BhdTitan Petchem Malaysia2008
Titan Petchem Pasir Gudang - 2H-114 (Z10) Furnace Shutdown (Coil , Tube & Boiler Plate Replacement Work).Kejuruteraan Sri LukutTitan Petchem Malaysia2008
Titan Pecthem Pasir Gudang - Water Treatment Plant Piping Fabrication & Installation Work , Piping Tie-In Work.CCM Water Systems Sdn BhdTitan Petchem Malaysia2008
Titan Petchem , Pasir Gudang - EPCC Of Services BFW Injection Facility At TPC 1 , Furnace Shutdown & Piping Works At TPP2 Finishing Plant.Sri Takada Industries (M) Sdn BhdTitan Petchem Malaysia2007
Titan Petchem , Pasir Gudang - Furnace H-11 Piping Fabrication & Installation WorksSri Takada Industries (M) Sdn BhdTitan Petchem Malaysia2006
Titan Petchem , Pasir Gudang - TPC 1 TA2006 Defect List Package - Valve , Piping & Platform Replacement , Cracker Gas Transfer Piping For Inter Connecting Piping Work From TPC 2 To TPC 1.Sri Takada Industries (M) Sdn BhdTitan Petchem Malaysia2006